Our Capabilities

A 360° approach to mining in East Africa. From the first permit to the final gold pour.

Engineering & Construction

Turnkey Plant Development (EPCM)

Plant Construction (EPCM)

We execute full Engineering, Procurement, and Construction Management. From CIL/CIP circuits to Vat and Heap Leaching, we handle civil works, steel erection, and installation.

Get EPCM Services Now

Turnkey Project Management

We take ownership of the schedule and the budget. Our project managers oversee the entire development lifecycle, coordinating contractors and supply chains to ensure your mine is built on time.

Get Project Management

Tailings Dams (TSF)

We design engineered Tailings Storage Facilities ensuring environmental compliance. Includes geotechnical lining, decant systems, and water balance modeling.

Get TSF Design Now

Machinery & Spares Supply

We supply heavy mining machinery and critical spare parts. From Ball Mills and Crushers to Slurry Pumps and Conveyor systems, we ensure your site has the reliable hardware required for continuous production.

Order Equipment Now

Geological Exploration

Resource Definition & Compliance

Survey & GIS Mapping

We find the ore. Our geologists execute geochemical sampling and drilling programs, utilizing ArcGIS to define high-potential targets before you spend capital.

Get Exploration Now

Feasibility Studies

We validate the economics. We conduct rigorous Scoping, Pre-Feasibility (PFS), and Definitive Feasibility Studies (DFS) to tell you if a project is bankable.

Get Feasibility Now

EIA & Licensing

We secure the license to operate. We manage the full Environmental Impact Assessment process, coordinating with NEMC/NEMA for regulatory approval.

Get Licensing Help Now

Metallurgy & Operations

Optimization & Supply Chain

Chemicals Supply

Secure supply chain for mining consumables. We supply high-purity Sodium Cyanide, Activated Carbon, and Fluxes with "just-in-time" delivery to remote sites.

Get Chemicals Now

Process Optimization

We sweat the asset. Our audits identify inefficiencies to reduce production costs by up to 50% and improve plant recovery rates to over 98%.

Get Optimization Now

Technical Training

We build teams. We deliver hands-on training on SOPs, Smelting Protocols, and Cyanide Safety to ensure your local workforce can operate safely.

Get Training Now

Mining Personnel Recruitment

We possess a vast network of vetted mining professionals across East Africa ready to deploy. We recruit and set up your full site team, including Mine Managers, Metallurgists, and Senior Engineers.

Hire Mining Staff Now

Finance & Trade

Valuation & Market Access

Valuation & Advisory

We build detailed DCF Models and conduct independent Due Diligence on acquisitions to expose hidden risks before you invest capital.

Get Valuation Now

Gold Export Logistics

Global market access. We manage royalties, documentation, and secure logistics to move bullion to international refineries (Dubai/Swiss) for liquidity.

Get Export Help Now

Concentrate Sourcing

We facilitate the trade of high-grade concentrates. We manage Toll Milling contracts and source material from ASM groups with transparent processing.

Get Sourcing Now
Frequently Asked Questions (FAQs)

Frequent Questions by our Typical Clients, the Modern Miners

We answer the hard financial questions before you ask them. Transparency is our currency.

Can I start a gold mining operation with a budget of $50,000 - $100,000 USD?

Yes. We reject the idea that professional engineering is only for giants. For this investment level, we design Modular Vat Leaching or Pilot CIP circuits tailored to your budget. These systems are manual but metallurgically efficient. With high-grade ore, such a facility can reliably produce 1kg+ of gold per month.

Is it profitable to process old Tailings (Dumps) instead of fresh ore?

Extremely. Processing tailings eliminates the cost of mining, blasting, and crushing. We specialize in Retreatment Flowsheets that recover fine gold previous miners missed.

What is the minimum capital required for a fully mechanized Industrial Mine?

There is no single number, as Geology dictates the Budget. However, for a fully mechanized CIL operation capable of processing 50+ TPD, capital expenditure typically starts at $250,000 - $400,000 USD.

Why do many small-scale mining investments fail?

They often treat mining as "digging" rather than engineering. Most capital is lost to Metallurgical Blindness. We mitigate this by prioritizing Lab Test Work before deploying heavy equipment.

How long from Greenfield to First Gold Pour?

Typically 12 to 18 months: 3 months Geological Verification, 3 months Environmental & Licensing, 6 months Construction & Commissioning, 3 months Ramp-up.

Is CIL or CIP better?

Depends on your ore. We often recommend CIL in regions with preg-robbing carbon because it secures gold during leaching.

Can Jajanta fix sub-optimal recovery?

Yes. We perform a full Metallurgical Audit, rebalance reagents, and typically lift recoveries into industry-standard ranges.

What is the first step to engage Jajanta?

Begin with a Technical Site Audit. Our 72-hour audit samples geology, assesses infrastructure, and delivers a Bankability Roadmap.

Ready to Scale Your Operation?

Jajanta delivers the management, technical, and commercial support you need.

Engage Us
Chat with Us